The power is nuclear. The foundation is ours.

Since 1984, OECC has built civil structures and fabricated mechanical systems for NPCIL at five of India's nuclear power stations. Two generations now lead the company together.

Company
Om Engineering Construction Company
Works
Civil construction and mechanical fabrication
Client
NPCIL
Established
1984
Sites
Rawatbhata, Narora, Kakrapar, Kudankulam, Kaiga

Why we build for nuclear

Nuclear power runs around the clock and emits about as much carbon over its life as wind. It has one of the lowest death rates per unit of electricity of any source. Every figure below comes from a peer-reviewed or intergovernmental source, cited under the chart.

Lifecycle greenhouse-gas emissions by source

Show the data as a table

Between 1971 and 2009, by replacing fossil-fuel power, nuclear plants worldwide avoided

64 billiontonnes of CO₂-equivalent emissions

1.84 milliondeaths from air pollution

Kharecha, P.A. & Hansen, J.E. (2013). Prevented mortality and greenhouse gas emissions from historical and projected nuclear power. Environmental Science & Technology 47(9), 4889–4895. doi:10.1021/es3051197

Those plumes are water vapour

A cooling tower releases warm water vapour from the plant's cooling circuit. Nothing is burned to raise a nuclear plant's steam, so there is no combustion smoke.

India's nuclear build-out has barely begun

In 2024–25 India's reactors generated a record 56,681 million units, about 3.1% of the country's electricity, and avoided around 49 million tonnes of CO₂. The target for 2047 is at least 100 GW, more than eleven times today's capacity. Each new unit starts with excavation, foundation rafts, containment structures and kilometres of fabricated piping: the work OECC does.

Installed nuclear capacity in India

Gigawatts installed, by year each unit entered commercial operation

Show the data as a table
Today's capacity against national targets

Gigawatts

Show the data as a table

Two generations. One standard of work.

On a nuclear site, every pour, weld and fabricated component is inspected against the drawing before it is accepted. OECC has worked to that standard since 1984.

Founded and built

OECC was founded in 1984 by Ram Niwas Sharma and Sri Niwas Sharma. The first generation carried out civil and mechanical works at Rawatbhata (RR site) Units 3 and 4 and at the Narora, Kaiga and Kakrapar sites, earning the company its place on NPCIL projects, where quality assurance comes before speed and a contractor is only as good as its last inspection.

Scaling up

Dheeraj Sharma, Pankaj Sharma and Deepak Sharma joined the legacy in 2014 and stepped into key leadership roles by 2022, with all generations remaining actively involved. The second generation has carried the company's civil and mechanical work to Kaiga, Rawatbhata (RR site) and Kudankulam, and is taking on larger packages as India expands its nuclear fleet.

  1. 1984Ram Niwas Sharma and Sri Niwas Sharma found OECC.
  2. 2014Dheeraj, Pankaj and Deepak Sharma join the company.
  3. 2022The second generation steps into key leadership roles, alongside the founders.

From the directors' desk

Two founders and three directors. All five remain actively involved in OECC's work on NPCIL sites.

Founders

“When one spends forty years erecting monuments of atomic power, one realises that true greatness isn't measured by the height of the towers, but by the absolute peace of mind of the nation sleeping beneath its shadow.”

Ram Niwas Sharma Founder

“A true builder of India's nuclear triad doesn't measure success by balance sheets alone, but by the clean gigawatts delivered securely to the national grid, fueling India's industrial heartbeat.”

Sri Niwas Sharma Founder

Directors

“As India races toward net-zero targets, base-load nuclear energy is the ultimate anchor. Our generation's responsibility is to scale nuclear capacity safely, swiftly, and seamlessly into India's green grid. Monsoons, geological surprises, and intricate regulatory approvals will test your soul before the first dome is lifted. If your resolve isn't anchored deeper than a reactor foundation, the nuclear sector will wash you away.”

Dheeraj Sharma Director

“We carry the heavy armor of a legendary 40-year nuclear legacy, but we run with the hunger, agility, and tech-driven vision of modern nation-builders. That is how empires endure.”

Pankaj Sharma Director

“In commercial construction, a millimeter is negotiable. In nuclear infrastructure, a fraction of a millimeter is the boundary between safety and catastrophe. Forty years have taught us that excellence is not an act; it is our non-negotiable religion.”

Deepak Sharma Director

On site at five NPCIL stations

OECC has carried out civil construction and mechanical fabrication at these nuclear power stations, from Rajasthan to the southern tip of Tamil Nadu.

Map of India with OECC project sites Rawatbhata Narora Kakrapar Kudankulam Kaiga

Rawatbhata, Chittorgarh district, Rajasthan (RAPS and RAPP)

Reactors
Pressurised heavy water reactors (PHWR)
Units
RAPS-2 to 6 (200 MWe and 4 × 220 MWe) and RAPP-7 (700 MWe) in operation. RAPP-8 (700 MWe) began fuel loading in September 2026. RAPS-1 is permanently shut down.
Of note
RAPP-7, in commercial operation since April 2025, is India's third indigenous 700 MWe PHWR.
OECC's work
Civil and mechanical works at Units 3 and 4 (first generation), and continuing civil and mechanical work at the site (second generation).

Narora, Bulandshahr district, Uttar Pradesh (NAPS)

Reactors
Pressurised heavy water reactors (PHWR)
Units
2 × 220 MWe, in commercial operation since 1991 and 1992.
Of note
Unit 2 completed 731 days of continuous operation in 2020.
OECC's work
Civil and mechanical works (first generation).

Near Vyara, Tapi district, Gujarat (KAPS and KAPP)

Reactors
Pressurised heavy water reactors (PHWR)
Units
2 × 220 MWe (1993, 1995) and 2 × 700 MWe (2023, 2024): 1,840 MWe in all.
Of note
Unit 3 was India's first indigenous 700 MWe PHWR.
OECC's work
Civil and mechanical works (first generation).

Tirunelveli district, Tamil Nadu (KKNPP)

Reactors
VVER-1000 pressurised water reactors (Russian design)
Units
Units 1 and 2 (1,000 MWe each) in operation since 2014 and 2017. Units 3 to 6 are under construction.
Of note
India's largest nuclear power station by installed capacity, at 2,000 MWe.
OECC's work
Civil and mechanical work (second generation).

Kaiga, Uttara Kannada district, Karnataka (KGS)

Reactors
Pressurised heavy water reactors (PHWR)
Units
4 × 220 MWe in operation (2000 to 2011). Units 5 and 6 (2 × 700 MWe) under construction since the first concrete pour in March 2026.
Of note
Unit 1 set a world record for continuous operation: 962 days, from 2016 to 2018.
OECC's work
Civil and mechanical works under both generations.

Tell us about your package

Tender, subcontract or joint-venture enquiry, send us the details and our team will get back to you.

Email
deepak@oeccpl.com
Phone
+91 88022 32134
Head office
Rawatbhata, Rajasthan, India

Enquiry form

Open in a new tab